This is the phase that most often decides an opening date, and the one inexperienced operators underestimate most. Compliance failures rarely arrive as a single dramatic event — they accumulate quietly and surface at audit.
Applications, policy manuals and documentation are prepared while construction is still running, because most licenses require a substantially complete facility to inspect. Waiting until the building is finished adds weeks at the most expensive point, when payroll has usually already started.